Data center 2N UPS single-line
Single-line diagram for a dual-path data center power train with utility feeds, UPS A/B, static transfer switch, and critical load panels.
For the critical-facility engineer
SLD·§ IEEE 315-1975
↘ preview
100%
UTF-8 · LF · 26 lines · 840 chars✓ parsed·3.0 ms·8.6 KB SVG
Scenario
Data centers are sold on redundancy. A 2N power path has two independent sources and UPS chains so either side can carry the critical load. A one-line diagram makes that redundancy auditable.
Annotation key
- Two utility and transformer paths stay separate until the transfer point.
upsnodes show the energy-storage conversion stage.- The transfer switch feeds two PDUs before the critical IT load.